|
|
| |
 |
| |
1 line of 8.7 mtrs width with an annual capacity of 30,000 MT is being expected to be commissioned in August 2011. |
Metalizer |
15 Metalizers with an annual capacity of 120000 MT is being expected to be commissioned by 2013. |
Metalizer |
6 new Line of BOPP Film with an annual capacity of 204000 MT is being expected to be commissioned by 2013. |
Poly Chips |
1 Poly Chips(CP) line with an annual capacity of 64,800 MT is being expected to be commissioned by Sep 2010. |
| |
| |
|